Find The Needle Add My Company
An economiser fitted into the exhaust of a Waste Heat Boiler on a gas turbine power generator. The unit was fitted with an integral flue gas by-pass and preheated boiler feed water in within 10 degrees of saturation temperature at 20 bar. The by-pass was used to automatically regulate the flow of gases through the economiser and so control the water temperature at all combinations of power/heat. Case Study 3 Capital Cost £64K Savings 270KW Payback 18 Months

For more information on Case Study: BNFL Springfields talk to ThermTech Ltd

Enquire Now

  Please wait...

Location for : Listing Title