Find The Needle Add My Company
Sub base preparation / Sub base compaction
  • The key to constructing a structurally sound concrete slab heavily relies upon first class sub base preparation.
  • The sub base should be constructed on top of well drained and sound sub grade.
  • Well graded granular shot type material should be used to form the sub base and once levelled and compacted, a thin blinding layer of sand (no deeper than 20mm) can be used to fill any voids in the surface.
  • Key Points:
    Good quality MOT
    Fully compact using whacker plate or similar.
    A flat, level sub base will greatly reduce the risk of cracking.

For more information on Sub base preparation / Sub base compaction talk to New Mix Concrete

Enquire Now

  Please wait...

Location for : Listing Title