Variable Speed Drive Upgrade Preparation at Grange Farm

As part of a Variable Speed Drive Upgrade at Grange Farm, Gibbons Engineering Group completed essential preparation works for NWL, including the removal of redundant VSD modules, busbars, cabling, and associated components. The works created a clean, organised installation environment ready for the next stage of the drive system upgrade.

 

Case Study: Variable Speed Drive Upgrade Preparation at Grange Farm

 

Customer

 

Northumbrian Water

Project Location

Grange Farm

Date

23 July 2026

Project Overview

Gibbons Engineering Group was appointed to carry out preparatory works at Grange Farm ahead of a Variable Speed Drive (VSD) module upgrade. The project involved the safe removal of redundant drive equipment, associated electrical components, and site preparation to allow installation of the new modules.

 

Scope of Works

 

As part of the upgrade works, the existing LCL, ISU and INU modules were removed, along with all associated busbars and metalwork connected to the redundant drive system.

 

Additional removal works included:

 

  • Removal of fan feeds associated with the previous INU modules
  • Removal of redundant fibre optic cables
  • Removal of external 24V power supplies

Following removal of the old equipment, the existing cabinets were thoroughly cleaned and prepared ready for the installation of the new modules and associated components.

 

Project Progress

 

A new keypad and cover plate were installed as part of the preparation works, with the replacement modules and required parts safely stored on site ready for the next stage of the project.

 

Photographs were taken throughout the works to support future planning and review. Updated drawings provided by the customer were also incorporated into the project planning process to ensure the next visit can be completed efficiently.

 

Site Management & Handover

 

All removed waste materials were cleared from site, and the work area was left clean, tidy, and in the same condition as found on arrival.

 

The customer requested that the removed modules remain on site, and these were safely retained as instructed.

A review of the planned follow-up visit was recommended following the information gathered during the works, with the customer kept informed regarding any potential changes to the schedule.

 

Outcome

 

The preparatory works at Grange Farm were completed successfully, creating a clean and organised installation environment ready for the next phase of the VSD upgrade. Through careful removal of redundant equipment, detailed site assessment, and effective communication with NWL, Gibbons Engineering Group has helped ensure a smooth transition towards the new drive system installation.

For more information on Variable Speed Drive Upgrade Preparation at Grange Farm talk to Gibbons Engineering Group Ltd