Sign In
Our long reach excavators can reach up to 30 metres and are correctly counter-balanced to ensure stability on embankments. The larger machines are capable of handling soil nailing rigs and masts in excess of 2 tonnes.
Projects in the rail industry, landfill and waste disposal facilities together with water industry sectors are included in our experience, using specialist attachments for cutting, profiling and drilling on steep slopes.
Recent Projects:
Rock face profiling and drilling of anchors, Somerset
Soil nailing to highway embankment, Gloucestershire
Soil nailing to railway cutting at Crewe, Cheshire
Rail slope stabilisation, compaction and re-profiling, Bristol
Installation of spillway erosion control blocks, Brent Reservoir, London
Augering of mini piles for embankment stabilisation, WCML
Placing of geotextiles to embankment structures, M6 Toll road
For more information on Rock Face Profiling talk to WM Plant Hire Ltd
Enquire Now
More products
List your company on FindTheNeedle.