Find The Needle Add My Company
Integral Surface Designs

300 kW Wood Waste Burning Equipment
Panel Processing

 

Ranheat supplied and installed a 300 kW Boiler based wood-waste burning equipment with a new design 60kW economiser to produce a total output of 360kW, a 50 m3 conical bottom silo, 4m diameter, twin rotary valves and transport screw in November 2012.

Supplied and installed 3 Sabiana unit heaters in their factory unit to include heating pipes to connect to the heaters all complete with control panels.

Two heat meters to comply with requirements for the RHI Scheme.

For more information on Integral Surface Designs talk to Ranheat Engineering Ltd

Enquire Now

  Please wait...

Location for : Listing Title