Get Listed
Sign In
These sturdy flooring installations can be designed to take loads from 3.5Kn/m2 (office loading) to 15 Kn/m2 (heavy machinery). Constructed using square hollow section columns sat on the existing ground floor slab, universal beams bolted to the top of the columns with secondary ?C? section galvanised purlins cleated between. A choice of decking is added to form the floor of the structure, 38mm heavy duty particle board is used in most applications but other finishes can be used such as flat plate steel, chequer plate or open steel grating.
For more information on Steel Mezzanine Upraised Floors talk to PDC Consultancy Limited
Welcome back to FindTheNeedle.
Not registered? Get listed — most visitors don't have an account yet.
List your company on FindTheNeedle.