Find The Needle Get Listed
Rest Bends For The Construction Industry
Rest bends are installed at the foot of a soil stack, making the connection between the soil and vent system and the underground drainage system. Rest bends have a longer radius than standard 87.5 or 88 degree bends to minimise the chance of any blockages. They also incorporate a moulded plastic foot that enables the bend to be self-supporting. The Settlement rest bend has a higher reach than a standard rest bend. Both ends of this fitting incorporate a 110mm ring seal push fit socket.

For more information on Rest Bends For The Construction Industry talk to Meridian Building Plastics

  Please wait...

Location for : Listing Title