Get Listed
Sign In
Dry lining and partitioning involves repeated work at ceiling level, from fixing head tracks and boards to jointing and finishing. A mobile scaffold tower can give installers a more stable and productive platform than ladders, particularly on commercial fit-out projects where the same work continues across a large floorplate.
AGR towers for boarding and framing
A wider AGR tower is useful where two installers need to work together on head tracks, framing or plasterboard. The larger deck provides room for both operatives and hand tools, although full boards should be handled using an appropriate lifting method rather than stored loosely on the platform.
Mi Tower for finishing work
Once partitions are boarded, a compact tower can be practical for jointing, sanding, decoration and minor snagging. A Mi Tower can be moved quickly between positions and is particularly useful for a single operative working at standard office ceiling heights.
Narrow towers in corridors
Partitioning often creates corridors and smaller rooms before the fit-out is complete. Narrow scaffold towers can continue to provide access where a standard-width tower no longer fits, making them useful for finishing head tracks, ceiling junctions and services in confined areas.
Protecting finished floors
As a project moves towards completion, castors and stabilisers need to be used carefully around newly laid floors and finished surfaces. Suitable protection should be installed where necessary and debris kept clear of the tower's movement path.
Choosing the right tower for each stage of dry lining can improve productivity considerably. Wider platforms suit the main installation phase, while smaller or narrower towers often become more useful as rooms are formed and the project moves into finishing and snagging.
AGR towers for boarding and framing
A wider AGR tower is useful where two installers need to work together on head tracks, framing or plasterboard. The larger deck provides room for both operatives and hand tools, although full boards should be handled using an appropriate lifting method rather than stored loosely on the platform.
Mi Tower for finishing work
Once partitions are boarded, a compact tower can be practical for jointing, sanding, decoration and minor snagging. A Mi Tower can be moved quickly between positions and is particularly useful for a single operative working at standard office ceiling heights.
Narrow towers in corridors
Partitioning often creates corridors and smaller rooms before the fit-out is complete. Narrow scaffold towers can continue to provide access where a standard-width tower no longer fits, making them useful for finishing head tracks, ceiling junctions and services in confined areas.
Protecting finished floors
As a project moves towards completion, castors and stabilisers need to be used carefully around newly laid floors and finished surfaces. Suitable protection should be installed where necessary and debris kept clear of the tower's movement path.
Choosing the right tower for each stage of dry lining can improve productivity considerably. Wider platforms suit the main installation phase, while smaller or narrower towers often become more useful as rooms are formed and the project moves into finishing and snagging.
For more information on Best Scaffold Towers for Dry Lining and Partitioning Work talk to Lakeside Hire
Welcome back to FindTheNeedle.
Not registered? Get listed — most visitors don't have an account yet.
List your company on FindTheNeedle.