Get Listed
Sign In
Generators and UPS systems should be tested together. We load test both and check the handover between them.
A UPS that has never been tested under load is a UPS you are trusting blind. We test operation, transfer and battery performance in controlled conditions, so weaknesses show up on our watch and not during a real power cut. Results are recorded and reported.
From single phase office units to large three phase systems, Cetronic has the skills and kit to help. Get in touch on 01920 871077 or sales@cetronicpower.com.
For more information on Generator and UPS Load Testing Service talk to Cetronic Power Solutions
Welcome back to FindTheNeedle.
Not registered? Get listed — most visitors don't have an account yet.
List your company on FindTheNeedle.