Find The Needle Get Listed

White Sunwood Spider Section

Product Code: SUN-TRSW

White Sunwood Spider Section

White Sunwood Spider Section



When comparing products for your project, use the specifications for White Sunwood Spider Section to check the required configuration. Use product code SUN-TRSW when selecting or ordering this item.



Enhance your conservatory's structure with the White Sunwood Spider Section, a key component of the Sunwood Timber Glazing System. This aluminium cast spider is available in either a robust powder-coated finish in white or brown, or a mill finish that allows for custom colouring to suit your design preferences. Its strong yet lightweight build ensures it integrates seamlessly with the Sunwood Ridge, Cresting, and Finials, as well as Screw-Down rafter bar ranges.



Product features:



Versatility: Compatible with Sunwood's 50/60mm Rafter Main Bars, the Spider Section fits many roof designs and sizes, adapting to various structural requirements.



Durability: Features quality powder-coating for a durable, consistent finish that withstands the test of time and weather, ensuring maintenance-free longevity.



Serviceability: Designed to be fully serviceable, Sunwood components can be easily removed and replaced as needed, enhancing the system’s practicality.



Integration: Engineered to neatly fit with other Sunwood products, promoting a cohesive and integrated architectural solution.



Installation Ease: Boasts an easy-fit system that simplifies installation, reducing labour time and complexity.



Material Compatibility: Works with both glass and polycarbonate glazing materials, providing flexibility in use.



Warranty: Comes with a 5-year guarantee, affirming the quality and reliability of the Spider Section.



Note: The Sunwood Spider should not be used with the Hip Rafter Bar. For these applications, the Plastic Spider Top Cap is recommended to ensure compatibility and optimal performance.



Start by planning the dimensions of the glazing area and the layout of its supports. Measure the actual openings and allow for the engagement of the sheet or profile within the chosen glazing system. Nominal sheet dimensions are not necessarily the same as the finished coverage. A cutting schedule based on the real installation is more useful than selecting a size solely from the overall area.



The sheet thickness, glazing profile and intended application must be considered together. Different glazing systems accommodate different material thicknesses and have their own requirements for support, movement and edge finishing. Do not assume that a sheet can replace another thickness without checking the bars, seals and supports. For overhead glazing, the suitability of the complete structure should be confirmed before purchase.



Think about the desired level of daylight, privacy and solar exposure when comparing glazing finishes. The position of the structure, its orientation and nearby surfaces all influence how the finished installation will feel. Compare the specified finish with the other materials used in the project, and use the manufacturer's published performance information if a particular thermal or light transmission target is important.



Keep glazing products protected from damage during transport and preparation. When cutting or handling is permitted, follow the relevant guidance for tools, protective films and edge treatment. Establish which face should be exposed and whether the system requires particular tapes, closures or drainage arrangements. These details depend on the selected sheet and profile, so use the actual system instructions rather than applying one method to every type of glazing.



For larger projects, prepare a list of materials and check quantities against the final measured layout. Group items by their intended position so that similar components are not confused during fitting. This also makes it easier to identify which sizes or finishes still need to be ordered if the design changes before the work is complete.



Think about how the finished area will be accessed after the work is complete. If inspection, cleaning or replacement is likely to be necessary, consider whether the planned layout allows for it without disturbing unrelated materials. Follow the maintenance and access requirements for the particular system, especially where a component will be concealed by subsequent work.



Allow time to inspect the delivered materials before installation. Compare their identifying labels with the order and check for obvious damage or missing components. Keep items in the condition recommended by the manufacturer until they are needed, and avoid exposing finished surfaces to unnecessary damage during other building work. This is easier than discovering a problem once the materials have already been cut or fitted.

For more information on White Sunwood Spider Section talk to Building Plastics Online Limited

  Please wait...

Location for : Listing Title