Get Listed
FloPlast Underground 87° Double Socket Bend
Product Code: D561
FloPlast Underground 87° Double Socket Bend
Select the fitting to suit the pipework layout. The FloPlast Underground 87° Double Socket Bend is the product specified here. Use product code D561 when selecting or ordering this item.
FloPlast Underground 87 Degree Double Socket Bend – Reliable Directional Adjustment for Drainage Systems
The FloPlast Underground 87 Degree Double Socket Bend is an essential fitting for smoothly adjusting the direction of underground drainage pipes. With its 87-degree angle and double socket design, this bend ensures precise alignment and efficient water flow while minimising resistance. Made from durable PVC, it provides a secure, leak-proof connection that enhances the overall performance and reliability of your drainage system. Suitable for both residential and commercial projects, it’s the perfect choice for creating efficient underground drainage networks.
Optimised for Smooth Flow.
The 87-degree angle is designed to maintain consistent water flow through the drainage system, reducing turbulence and the risk of blockages. Its double socket feature allows for a straightforward and precise connection, ensuring a watertight seal every time.
Durable and Long-Lasting Construction.
Made from high-grade PVC, this double socket bend is designed to resist the demanding conditions of underground environments. Resistant to corrosion, pressure, and environmental stress, it guarantees durability over time and little ongoing maintenance.
Ideal for Residential and Commercial Applications.
The FloPlast Underground 87 Degree Double Socket Bend is suitable for a range of drainage projects, from domestic systems to large-scale commercial installations. Its simple installation process makes it a practical choice for both professional contractors and DIY enthusiasts.
For an efficient and durable solution to directional changes in your underground drainage system, choose the FloPlast Underground 87 Degree Double Socket Bend. With its reliable design and robust performance, it’s an indispensable component for maintaining a high-functioning drainage network.
Start with a drawing of the complete drainage or rainwater run, including the positions where water enters, changes direction and leaves the system. A fitting should be selected to suit its particular position in that layout. Confirm the relevant nominal size and profile, since components with a similar appearance are not necessarily designed to connect to one another.
Consider how the system will be supported and how it can be inspected after installation. The required fall, joint arrangement and access provisions depend on the type of drainage system and its intended use. Establish those details from the applicable installation guidance before work begins. For underground or concealed work, check the surrounding ground or structure and the requirements for the completed system.
If the project involves replacing a damaged component, identify the existing manufacturer's range and connection type wherever possible. Measure the old fitting and the adjoining components, and check the cause of the original problem before replacing it. A new fitting may not resolve an issue arising from a blocked outlet, incorrect support or an unsuitable arrangement elsewhere in the run.
A complete system should be assessed for the expected flow and the conditions in which it operates. Where capacity or compliance is important, consult the published specifications or seek advice from a competent installer. Once the work is complete, check the connections and relevant access points in accordance with the system guidance and retain a record of the installed components for future maintenance.
Before making irreversible cuts or alterations, compare the item with the actual installation and check the necessary clearances. Where the system instructions permit trial positioning, use it to assess the layout before final fixing. If a proposed change affects the product's function or compatibility, obtain advice specific to the item before proceeding.
Think about how the finished area will be accessed after the work is complete. If inspection, cleaning or replacement is likely to be necessary, consider whether the planned layout allows for it without disturbing unrelated materials. Follow the maintenance and access requirements for the particular system, especially where a component will be concealed by subsequent work.
For larger projects, prepare a list of materials and check quantities against the final measured layout. Group items by their intended position so that similar components are not confused during fitting. This also makes it easier to identify which sizes or finishes still need to be ordered if the design changes before the work is complete.
For more information on FloPlast Underground 87° Double Socket Bend talk to Building Plastics Online Limited