Get Listed
FloPlast Underground 45° Single Socket Bend
Product Code: D163
FloPlast Underground 45° Single Socket Bend
The FloPlast Underground 45° Single Socket Bend is an option when planning drainage and pipework. Use product code D163 when selecting or ordering this item.
FloPlast 45 Degree Single Socket Bend – Efficient Directional Changes for Underground Drainage
The FloPlast 45 Degree Single Socket Bend is a key component for creating smooth directional changes in underground drainage systems. Designed to redirect water flow efficiently, this bend helps to prevent blockages while maintaining the integrity of your drainage network. Made from durable PVC, it is built to endure the harsh conditions of underground environments, making it a reliable choice for both residential and commercial applications. Its single socket end ensures an easy and secure connection, simplifying installation and saving time.
Optimised for Smooth Water Flow.
The 45-degree design of this bend allows for seamless water flow, reducing turbulence and minimising the risk of blockages. It’s an ideal solution for ensuring the efficient performance of your drainage system over time.
Durable PVC Construction.
Made from quality PVC, this single socket bend is resistant to corrosion, pressure, and environmental stress. Its robust construction ensures long-lasting performance in even the most demanding underground conditions.
Straightforward fitting.
The single socket end is designed for quick and straightforward connections to plain-ended pipes, making installation both efficient and hassle-free. This makes it a practical choice for professional contractors and DIY enthusiasts alike.
For a reliable and durable solution to directional changes in your underground drainage system, choose the FloPlast 45 Degree Single Socket Bend. Its superior construction, efficient design, and straightforward installation make it an essential component for maintaining a high-performance drainage network.
Start with a drawing of the complete drainage or rainwater run, including the positions where water enters, changes direction and leaves the system. A fitting should be selected to suit its particular position in that layout. Confirm the relevant nominal size and profile, since components with a similar appearance are not necessarily designed to connect to one another.
Consider how the system will be supported and how it can be inspected after installation. The required fall, joint arrangement and access provisions depend on the type of drainage system and its intended use. Establish those details from the applicable installation guidance before work begins. For underground or concealed work, check the surrounding ground or structure and the requirements for the completed system.
If the project involves replacing a damaged component, identify the existing manufacturer's range and connection type wherever possible. Measure the old fitting and the adjoining components, and check the cause of the original problem before replacing it. A new fitting may not resolve an issue arising from a blocked outlet, incorrect support or an unsuitable arrangement elsewhere in the run.
A complete system should be assessed for the expected flow and the conditions in which it operates. Where capacity or compliance is important, consult the published specifications or seek advice from a competent installer. Once the work is complete, check the connections and relevant access points in accordance with the system guidance and retain a record of the installed components for future maintenance.
Before making irreversible cuts or alterations, compare the item with the actual installation and check the necessary clearances. Where the system instructions permit trial positioning, use it to assess the layout before final fixing. If a proposed change affects the product's function or compatibility, obtain advice specific to the item before proceeding.
When the work is finished, retain the product reference and any instructions relevant to care and inspection. Use cleaning products and methods that are approved for the material and finish. If the item forms part of a larger assembly, follow the maintenance guidance for that assembly as well. Address any damage or changes in fit promptly rather than relying on cosmetic treatment alone.
Allow time to inspect the delivered materials before installation. Compare their identifying labels with the order and check for obvious damage or missing components. Keep items in the condition recommended by the manufacturer until they are needed, and avoid exposing finished surfaces to unnecessary damage during other building work. This is easier than discovering a problem once the materials have already been cut or fitted.
For more information on FloPlast Underground 45° Single Socket Bend talk to Building Plastics Online Limited