Find The Needle Get Listed
Floplast Underground 30° Double Socket Bend

Floplast Underground 30° Double Socket Bend



The Floplast Underground 30° Double Socket Bend is an option when planning drainage and pipework. Use product code D564 when selecting or ordering this item.



30 Degree Double Socket Bend – Smooth Directional Changes for Underground Drainage.



The 30 Degree Double Socket Bend is a versatile and essential component for achieving a 30-degree directional change in underground drainage systems. Designed to ensure smooth and efficient water flow, this fitting minimises resistance and reduces the risk of blockages. Its robust PVC construction guarantees durability, making it a reliable choice for both residential and commercial drainage applications.



Efficient 30-Degree Directional Change.



This double socket bend facilitates seamless directional adjustments, maintaining consistent water flow through your drainage system. The smooth design ensures minimal turbulence, promoting efficient drainage and long-term system performance.



Durable PVC Construction.



Made from quality PVC, this bend is designed to resist the demanding conditions of underground environments. Resistant to corrosion, pressure, and environmental stress, it ensures reliable performance over time with little ongoing maintenance.



Straightforward fitting with Double Socket Design.



The double socket ends allow for quick and secure connections to plain-ended pipes, making installation simple and efficient. This user-friendly design is ideal for professional contractors and DIY enthusiasts alike.



For a dependable and durable solution to 30-degree directional changes in underground drainage systems, choose the 30 Degree Double Socket Bend. Its smooth flow design, robust construction, and straightforward installation make it an essential addition to any drainage network.



Start with a drawing of the complete drainage or rainwater run, including the positions where water enters, changes direction and leaves the system. A fitting should be selected to suit its particular position in that layout. Confirm the relevant nominal size and profile, since components with a similar appearance are not necessarily designed to connect to one another.



Consider how the system will be supported and how it can be inspected after installation. The required fall, joint arrangement and access provisions depend on the type of drainage system and its intended use. Establish those details from the applicable installation guidance before work begins. For underground or concealed work, check the surrounding ground or structure and the requirements for the completed system.



If the project involves replacing a damaged component, identify the existing manufacturer's range and connection type wherever possible. Measure the old fitting and the adjoining components, and check the cause of the original problem before replacing it. A new fitting may not resolve an issue arising from a blocked outlet, incorrect support or an unsuitable arrangement elsewhere in the run.



A complete system should be assessed for the expected flow and the conditions in which it operates. Where capacity or compliance is important, consult the published specifications or seek advice from a competent installer. Once the work is complete, check the connections and relevant access points in accordance with the system guidance and retain a record of the installed components for future maintenance.



Check what is supplied with the item and what is required separately before arranging work. A description of a larger system does not necessarily mean that all of its components are included in a single listing. Refer to the product information and packing details for the chosen option, and contact the supplier if the required contents or compatible accessories are not clear.



Before making irreversible cuts or alterations, compare the item with the actual installation and check the necessary clearances. Where the system instructions permit trial positioning, use it to assess the layout before final fixing. If a proposed change affects the product's function or compatibility, obtain advice specific to the item before proceeding.



Allow time to inspect the delivered materials before installation. Compare their identifying labels with the order and check for obvious damage or missing components. Keep items in the condition recommended by the manufacturer until they are needed, and avoid exposing finished surfaces to unnecessary damage during other building work. This is easier than discovering a problem once the materials have already been cut or fitted.



For larger projects, prepare a list of materials and check quantities against the final measured layout. Group items by their intended position so that similar components are not confused during fitting. This also makes it easier to identify which sizes or finishes still need to be ordered if the design changes before the work is complete.

For more information on Floplast Underground 30° Double Socket Bend talk to Building Plastics Online Limited

  Please wait...

Location for : Listing Title