Find The Needle Get Listed
FloPlast Underground 15° Double Socket Bend

FloPlast Underground 15° Double Socket Bend



Select the fitting to suit the pipework layout. The FloPlast Underground 15° Double Socket Bend is the product specified here. Use product code D567 when selecting or ordering this item.



15 Degree Double Socket Bend – Efficient and Reliable Directional Changes for Underground Drainage



The 15 Degree Double Socket Bend is a quality fitting designed to facilitate subtle directional changes in underground drainage systems. Its 15-degree angle provides a smooth redirection of water flow, ensuring consistent performance while maintaining system stability. Made from durable PVC, this bend offers long-lasting reliability, making it an essential component for both residential and commercial drainage projects.



Optimised for Minimal Directional Changes.



This bend is tailored for layouts requiring slight adjustments, providing an efficient solution for redirection without disrupting the flow of water. Its smooth design reduces turbulence, minimising the risk of blockages and maintaining the overall efficiency of your drainage system.



Durable PVC Construction.



Made from high-grade PVC, this 15 Degree Double Socket Bend is designed to resist harsh underground conditions, including pressure, corrosion, and environmental stress. Its robust construction ensures dependable performance and little ongoing maintenance over time.



Double Socket Design for Straightforward fitting.



The double socket configuration ensures a secure and watertight connection with plain-ended pipes, simplifying installation. This user-friendly feature makes it suitable for professionals and DIY enthusiasts alike.



For a dependable and efficient solution to minor directional changes in your underground drainage system, choose the 15 Degree Double Socket Bend. Its durable construction, smooth flow design, and straightforward installation make it a practical addition to any drainage network.



Start with a drawing of the complete drainage or rainwater run, including the positions where water enters, changes direction and leaves the system. A fitting should be selected to suit its particular position in that layout. Confirm the relevant nominal size and profile, since components with a similar appearance are not necessarily designed to connect to one another.



Consider how the system will be supported and how it can be inspected after installation. The required fall, joint arrangement and access provisions depend on the type of drainage system and its intended use. Establish those details from the applicable installation guidance before work begins. For underground or concealed work, check the surrounding ground or structure and the requirements for the completed system.



If the project involves replacing a damaged component, identify the existing manufacturer's range and connection type wherever possible. Measure the old fitting and the adjoining components, and check the cause of the original problem before replacing it. A new fitting may not resolve an issue arising from a blocked outlet, incorrect support or an unsuitable arrangement elsewhere in the run.



A complete system should be assessed for the expected flow and the conditions in which it operates. Where capacity or compliance is important, consult the published specifications or seek advice from a competent installer. Once the work is complete, check the connections and relevant access points in accordance with the system guidance and retain a record of the installed components for future maintenance.



Allow time to inspect the delivered materials before installation. Compare their identifying labels with the order and check for obvious damage or missing components. Keep items in the condition recommended by the manufacturer until they are needed, and avoid exposing finished surfaces to unnecessary damage during other building work. This is easier than discovering a problem once the materials have already been cut or fitted.



Think about how the finished area will be accessed after the work is complete. If inspection, cleaning or replacement is likely to be necessary, consider whether the planned layout allows for it without disturbing unrelated materials. Follow the maintenance and access requirements for the particular system, especially where a component will be concealed by subsequent work.



If the product is being purchased for a repair, record the existing item and its surroundings before removing anything. Photographs, measurements and manufacturer references can make it easier to compare the replacement with the original. Where an exact replacement is unavailable, check the implications of a different profile or specification for the remaining components, rather than assuming it can be substituted without changes.

For more information on FloPlast Underground 15° Double Socket Bend talk to Building Plastics Online Limited

  Please wait...

Location for : Listing Title