Get Listed
FloPlast Grey 92.5° Double Branch
Product Code: SP230G
FloPlast Grey 92.5° Double Branch
When comparing products for your project, use the specifications for FloPlast Grey 92.5° Double Branch to check the required configuration. Use product code SP230G when selecting or ordering this item.
The FloPlast Grey 92.5° Double Branch is a versatile fitting designed to efficiently branch two pipelines from a mainline in underground drainage systems. Its precise 92.5° angle optimises waste flow by minimising resistance, reducing the risk of blockages, and ensuring smooth transport within the system. This fitting is used for creating reliable and efficient connections in complex drainage networks.
Design and features.
Optimised Angle: The 92.5° design ensures smooth waste flow, reducing turbulence and promoting system efficiency.
Dual Connections: Supports two branching pipelines for enhanced system flexibility and functionality.
Durable Construction: Made from quality PVC to resist corrosion, impact, and weathering for long-lasting performance.
Grey Finish: Seamlessly integrates with existing soil systems for a cohesive appearance.; Benefits; Improved Efficiency: Ensures reliable waste transport with reduced risk of blockages.
Durability over time: Designed to resist environmental stresses and the demands of daily use.
Versatile Application: Ideal for residential, commercial, and industrial drainage systems.; Installation Tips; Ensure all pipe ends are clean and properly prepared for connection.
Use a suitable sealant or lubricant to create a watertight and secure joint.
Position the branch accurately within the system for optimal performance.
The FloPlast Grey 92.5° Double Branch combines functionality, durability, and aesthetic appeal, making it a reliable choice for modern underground drainage solutions.
Start with a drawing of the complete drainage or rainwater run, including the positions where water enters, changes direction and leaves the system. A fitting should be selected to suit its particular position in that layout. Confirm the relevant nominal size and profile, since components with a similar appearance are not necessarily designed to connect to one another.
Consider how the system will be supported and how it can be inspected after installation. The required fall, joint arrangement and access provisions depend on the type of drainage system and its intended use. Establish those details from the applicable installation guidance before work begins. For underground or concealed work, check the surrounding ground or structure and the requirements for the completed system.
If the project involves replacing a damaged component, identify the existing manufacturer's range and connection type wherever possible. Measure the old fitting and the adjoining components, and check the cause of the original problem before replacing it. A new fitting may not resolve an issue arising from a blocked outlet, incorrect support or an unsuitable arrangement elsewhere in the run.
A complete system should be assessed for the expected flow and the conditions in which it operates. Where capacity or compliance is important, consult the published specifications or seek advice from a competent installer. Once the work is complete, check the connections and relevant access points in accordance with the system guidance and retain a record of the installed components for future maintenance.
For ordering purposes, use the product reference in this listing alongside the name and any selected option. A product family may contain several sizes or finishes, and the name shared by that family does not identify every individual version. Check that the reference on the order confirmation matches the item required, particularly when several similar components are being purchased for the same project.
Check what is supplied with the item and what is required separately before arranging work. A description of a larger system does not necessarily mean that all of its components are included in a single listing. Refer to the product information and packing details for the chosen option, and contact the supplier if the required contents or compatible accessories are not clear.
Think about how the finished area will be accessed after the work is complete. If inspection, cleaning or replacement is likely to be necessary, consider whether the planned layout allows for it without disturbing unrelated materials. Follow the maintenance and access requirements for the particular system, especially where a component will be concealed by subsequent work.
Before making irreversible cuts or alterations, compare the item with the actual installation and check the necessary clearances. Where the system instructions permit trial positioning, use it to assess the layout before final fixing. If a proposed change affects the product's function or compatibility, obtain advice specific to the item before proceeding.
For more information on FloPlast Grey 92.5° Double Branch talk to Building Plastics Online Limited