FloPlast Black Soil Pipe 135° Bottom Offset Bend

FloPlast Black Soil Pipe 135° Bottom Offset Bend



Select the fitting to suit the pipework layout. The FloPlast Black Soil Pipe 135° Bottom Offset Bend is the product specified here. Use product code SP435BL when selecting or ordering this item.



The FloPlast Black 135° Bottom Offset Bend is a practical and efficient fitting designed to provide a downward angle change in soil pipe installations, making it ideal for navigating obstacles and aligning pipework with building layouts. Its sleek black finish ensures seamless integration with other components, maintaining a cohesive and professional appearance throughout the system.



Design and features; 135° Angle: Enables precise directional changes to accommodate complex building layouts.; Durable uPVC Construction: Provides long-lasting performance, resisting impacts, weathering, and UV exposure.; Sleek Black Finish: Ensures aesthetic consistency across the entire drainage system.; Versatile Application: Suitable for residential, commercial, and industrial soil pipe systems.; Benefits.



Improved Alignment: Helps overcome installation challenges by allowing downward adjustments in pipe direction.



Efficient Waste Flow: Designed to maintain smooth waste movement, reducing the risk of blockages or leaks.



Low Maintenance: Offers a robust and maintenance-free solution for long-term reliability.; Installation Tips.



Ensure all pipe ends are clean and properly aligned before connecting the offset bend.



Use appropriate sealants or lubricants to create a watertight and secure connection.; Secure the pipe to the structure to prevent movement and maintain alignment.



The FloPlast Black 135° Bottom Offset Bend combines functionality and durability, providing an effective solution for directional changes in soil pipe systems while maintaining system efficiency and aesthetic appeal.



Start with a drawing of the complete drainage or rainwater run, including the positions where water enters, changes direction and leaves the system. A fitting should be selected to suit its particular position in that layout. Confirm the relevant nominal size and profile, since components with a similar appearance are not necessarily designed to connect to one another.



Consider how the system will be supported and how it can be inspected after installation. The required fall, joint arrangement and access provisions depend on the type of drainage system and its intended use. Establish those details from the applicable installation guidance before work begins. For underground or concealed work, check the surrounding ground or structure and the requirements for the completed system.



If the project involves replacing a damaged component, identify the existing manufacturer's range and connection type wherever possible. Measure the old fitting and the adjoining components, and check the cause of the original problem before replacing it. A new fitting may not resolve an issue arising from a blocked outlet, incorrect support or an unsuitable arrangement elsewhere in the run.



A complete system should be assessed for the expected flow and the conditions in which it operates. Where capacity or compliance is important, consult the published specifications or seek advice from a competent installer. Once the work is complete, check the connections and relevant access points in accordance with the system guidance and retain a record of the installed components for future maintenance.



Any project with particular performance or regulatory requirements should be checked against the relevant technical documentation. The catalogue description is useful for identifying the product, but is not a substitute for confirmation of suitability in the intended application. Seek clarification about any required rating, classification or guarantee that is not explicitly stated in the available product information.



Before making irreversible cuts or alterations, compare the item with the actual installation and check the necessary clearances. Where the system instructions permit trial positioning, use it to assess the layout before final fixing. If a proposed change affects the product's function or compatibility, obtain advice specific to the item before proceeding.



Allow time to inspect the delivered materials before installation. Compare their identifying labels with the order and check for obvious damage or missing components. Keep items in the condition recommended by the manufacturer until they are needed, and avoid exposing finished surfaces to unnecessary damage during other building work. This is easier than discovering a problem once the materials have already been cut or fitted.



For larger projects, prepare a list of materials and check quantities against the final measured layout. Group items by their intended position so that similar components are not confused during fitting. This also makes it easier to identify which sizes or finishes still need to be ordered if the design changes before the work is complete.

For more information on FloPlast Black Soil Pipe 135° Bottom Offset Bend talk to Building Plastics Online Limited