Why is Cost Reduction even a “thing” if we make every effort to get the design right?

Why is Cost Reduction even a “thing” if we make every effort to get the design right?
18/02/2021

It is a well-accepted rule-of-thumb that as much as 75% of the cost of a product is locked in during the concept design phase. By the time the product reaches production the ability to reduce costs is relatively small, with perhaps just a few percent of the cost available for CR. “Race to the bottom” In bygone days it was something of a tradition for buyers to try to overturn this accepted wisdom by a process known as “beating-up the supplier”. I even have experience of suppliers being expected to deliver on-going cost reductions year-on-year. The reality is, of course that it is not sustainable for suppliers to continually relinquish their (already competitive) margins and so for them the “race to the bottom” is not at all a viable long-term business strategy. The illustration below shows how most of the product cost (red curve) is committed in the design stages, whilst the ability to reduce cost (green curve) in the production phase is very small. Unfair, then to demand that cost reduction comes from the manufacturer when it is found that the costs are too high. Another accepted truism is that in the early stages of development, changes (to the design) can be made at minimal cost. Later on, when in production it can become very expensive to make changes because of the costs committed. Getting the design right, before costs are committed Consider the case of a Plastic Injection Moulded part. If changed during the design cycle a minor change may be dealt with by a few clicks of the mouse. However, once the part is in production the same change could easily involve engineering, design, manufacturing documentation, change control, Change Review & Implementation boards (CRB / CIB), product handbooks and procurement. At the manufacturing end the impact could impact stock control, require a tooling change (and let’s hope for material “off” the tool and not material on!), changes to shot weights and with it process settings such as temperature, cycle time etc. The parts may then have circle back through the formal acceptance processes such as FAI (First Article Inspection) and FFF (Fit, form & Function) testing.

Enquiry Form



More News

Why is Cost Reduction even a “thing” if we make every effort to get the design right?

Why is Cost Reduction even a “thing” if we make every effort to get the design right?

It is a well-accepted rule-of-thumb that as much as 75% of the cost of a product is locked in during the concept design phase. By the time the product...

Read More
What is good engineering design and how do we recognize it?

What is good engineering design and how do we recognize it?

In my spare time, I am a fan of Drew Pritchard’s TV shows “Salvage Hunters” and “Salvage Hunters: Classic Cars”. When visiting fellow antiques dealers...

Read More
Is mechanical engineering still an attractive career?

Is mechanical engineering still an attractive career?

As we and many others have written before, one of the biggest challenges facing the mechanical engineering sector in the UK is the prospect of an impe...

Read More

Read More

Read More

List your business

Would you like to register your company on one of the UK's largest and most effective Trade websites?

Are you looking for a reliable and consistent source of enquiries from your industry sector? Would you like to see why Find the Needle clients come back year after year to use our service? If so then feel free to register using the link 'here'.

Register
Office Address: