search

Series 4VT Boiler

Series 4VT Boiler
15/04/2021

Our Series 4VT Boiler has undergone a small change with the intention of saving materials. The Automatic TDS System used to be positioned on the right hand side of the boiler and travel towards the back which meant operatives needing to walk around the side of the boiler for access, service and maintenance. Now we have amended the position to put the system at the front of the boiler whereby operatives can stand in front of the boiler and everything is within easy reach. This also means that less copper piping is used for the gauge glass blowdown. The copper pipe used to travel all the way around the boiler and into the TDS Blowdown System towards the back of the boiler. Now all it has to do is travel down from the gauge glass remaining at the front of the boiler and entering the TDS Blowdown unit.

For more information on  Series 4VT Boiler  talk to  CFB Boilers Ltd

Enquiry Form



More News

Preventing steam boiler failures

Preventing steam boiler failures

With as many as a quarter of steam boilers failing their annual inspection, what should engineers be doing to improve the pass rate? asks Steed Webzel...

Read More
Series 4VT Boiler

Series 4VT Boiler

Our Series 4VT Boiler has undergone a small change with the intention of saving materials. The Automatic TDS System used to be positioned on the right...

Read More
Eco Friendly

Eco Friendly

CFB Boilers Ltd are continually striving to increase the Energy Efficiency & Eco friendliness of their products by where possible using: • Fitting fir...

Read More

Read More

Read More

List your business

Would you like to register your company on one of the UK's largest and most effective Trade websites?

Are you looking for a reliable and consistent source of enquiries from your industry sector? Would you like to see why Find the Needle clients come back year after year to use our service? If so then feel free to register using the link 'here'.

Register
Office Address: