Find The Needle Add My Company
Replacement Acoustic Doors & Integral Holding Frames
Replacement Acoustic Doors & Integral Holding Frames for the Energy Recovery Turbine Control Facility that supports Europe’s second largest blast furnace situated in the North East of England. Scope of Works To site survey, design, manufacture, deliver and install 8No.external door sets (up to 3m wide x 3m high) complete with integral holding frames, and the refurbishment of a further 10No. internal doors sets. Design Considerations •External & internal doorsets to be fit for purpose in reducing noise transmission, weatherproof and fire-rated where appropriate, whilst also providing gas containment or exclusion (hazardous gas area) thereby ensuring a safe working environment for operations & maintenance personnel. •Frames & doors abrasive blast cleaned with chilled iron grit to Grade Sa2½ of BS EN ISO 8501-1 and finished in accordance with the customer’s specific two-pack epoxy paint system for maximum life expectancy when operating within a steel-making environment sited at a coastal location. •Frames to be robust and securely fixed & sealed to brickwork using a weatherproof acoustic or intumescent mastic, to carry high specification acoustic doors. •Door leaves fitted with a variety of heavy duty, corrosion resistant door furniture appropriate for each location (i.e. strap or cam-lift hinges, slamfast latches & strikes, door closers, shoot-bolts, emergency exit system having ‘break-glass’ bolt with ceramic tube & hammer etc.) with Georgian-wired fire-resistant vision panels where required. •The assembled doorsets fitted with double-sealing acoustic, and 30 minute fire-rated intumescent seals, with particular attention to non-trip, flush thresholds.

For more information on Replacement Acoustic Doors & Integral Holding Frames talk to Acoustic Applications

Enquire Now

  Please wait...

Location for : Listing Title