Find The Needle Add My Company
Rail Loading Control Room
Rail Loading Control Room for the joint venture between Associated British Ports and the power generation industry, providing terminal investment at the King George Dock – Hull, where a new biomass handling facility is currently under construction. Scope of Works To design, manufacture and deliver the required control room, this being of approximate overall sizes 3.7m long x 2.9m wide x 2.7m high. Design Considerations The control room is to be sited in an area where explosive atmospheres may occur, and in this respect the facility is to be fit for purpose in providing a safe working environment for operations and maintenance personnel. To be installed in an elevated position, the strategically-placed inclined secondary glazed viewing panels allow operational personnel to oversee the rail loading process and view the rail stock entering and leaving the loading facility. Internal & external (and emergency) lighting, power, data transfer, fire detection & alarm etc., (all external electrical equipment to be compliant with the `Explosive Atmospheres Directive – Zone 22′) to be installed. Computer & visual display equipment is to be housed within the facility, and the unit is to provide such equipment with protection against dust, dirt and the harmful effects of condensation, corrosion etc. The end user intends to install a process control console within the facility, and the control room floor required a suitably sized, sealed aperture directly beneath the console to facilitate the installation of the necessary power cables, control wiring etc. All flooring finished in a hard-wearing vinyl tile overlay. A fan-assisted ‘fresh air intake’ ventilation system, filtered to EU7, is to be incorporated at low level (for ease of access, maintenance etc.) and an air conditioning system at high level for heating & cooling – with the condensing units, fans etc. located outside of the hazardous zone. Acoustic Performance An external noise level of 95dB(A) at 1 metre was reduced to 67dB(A) inside the Control Room, more than satisfying the customer's requirements.

For more information on Rail Loading Control Room talk to Acoustic Applications

Enquire Now

  Please wait...

Location for : Listing Title