Jordan Valve is changing the way in which control valves are ordered: no longer are these vital parts considered long lead items:
Products are manufactured to order in just a 2-3 week period.
We control manufacture from start to finish.
KC Controls guarantees the quality of a 100% USA made device.
How can KC Controls be so sure of quick deliveries? The answer is simple; Jordan manufacture from scratch and own their own casting foundry in the USA, so we control manufacture from start to finish without reliance on imported castings, controlling both the product time as well as the quality.
For more information on JORDAN’S VALVES – ‘LONG LEAD’ ITEMS OF THE PAST talk to KC Controls (UK) LLP